    Frequently Asked Questions

    Here are a few of the questions we get the most. If you don’t see what’s on your mind, reach out to us anytime on phone, chat, or email.

    All Package Steel Buildings require an engineered foundation with true footings, frost walls, and reinforced piers in column locations.

    Package steel has a network of qualified erectors and contractors across New England willing to work with you depending on size and location.

    Package Steel engineers and manufactures all our buildings in house using the highest qualified materials. Brokers are buying from other manufacturers looking for better margins, not a better building

    Package Steel offers a material and workmanship warranty. The length of warranty varies from 2 – 30 years.

    We ship materials on our own trailers, so all shipping and freight costs are included in your building quote.

    We provide an anchor bolt plan with dimensions and reactions and stamped building drawings for the structural system. Foundation and other trade drawings are not provided by Package Steel.

    Everything manufactured at Package Steel is custom to fit the customers’ needs whether it’s a warehouse, self-storage, airplane hangar, or backyard shed.

    Do you intend to have a full foundation for your building?

    All Package Steel buildings require a full and properly designed foundation including flooring, piers, and perimeter frost walls. This work should be completed prior to the arrival of the building on-site. Every foundation is site-specific and should be designed by a local engineer who will consider soil conditions, frost depths and any local regulations which may affect it.

    If you do not already have an engineer to design the foundation, Package Steel can provide assistance with locating an independent licensed engineer who can help you through this portion of the project.

    Do you have a building permit from your local city/town?

    Before any construction can begin, you must secure the required building permits from the city or town in which your site is located. This allows the local government to ensure your project and the resulting structure will be safe and meet all zoning, size and other requirements. The process involves submitting an extensive application along with a certified site plan, property deed and scheduling of all necessary inspections. Specific requirements vary among municipalities, as does the time it takes to get your building permits. An experienced builder can help you meet all these regulations and secure approval.

    Are you okay with a 6 month lead time?

    Metal buildings generally take less time to construct than wood or concrete buildings, but the exact timeline varies widely. We recommend allowing at least 6 months for the process, which includes matching you with a local builder, developing a scope of work and design proposal, fabricating the building components and delivering your structure to the site. The actual time from start to finish is determined by a variety of factors, including the size of the building, the complexity of the design, availability of materials and uncontrollable variables such as the weather.

    Have you contracted a builder?

    Some business owners with construction experience choose to build or to coordinate the building of their own structures independently, often with prefabricated metal building kits. This do-it-yourself approach can work for smaller structures, but for medium- to large-sized buildings, it’s best to enlist the services of a high-quality builder. An experienced builder, paired with the right metal building manufacturer, can help guide you through the entire process, from ensuring that your site and structure conform to all local building codes to construction to final approval for occupancy.