Get the first and most important tool for any successful metal building project

Detailed Building Specifications are crucial to a smooth, efficient and construction process.

    Fill out the form below to download Package Steel's Building Specifications

    Agreement: Submitting your contact information allows Package Steel to send you information about our products and services. You may unsubscribe from these communications at anytime.

    Get your Package Steel project off on the right foot with our step-by-step template.

    Includes Guidelines for

    Design Requirements

    Products & Materials

    Installation

    Quality Assurance

    Do you intend to have a full foundation for your building?

    All Package Steel buildings require a full and properly designed foundation including flooring, piers, and perimeter frost walls. This work should be completed prior to the arrival of the building on-site. Every foundation is site-specific and should be designed by a local engineer who will consider soil conditions, frost depths and any local regulations which may affect it.

    If you do not already have an engineer to design the foundation, Package Steel can provide assistance with locating an independent licensed engineer who can help you through this portion of the project.

    Do you have a building permit from your local city/town?

    Before any construction can begin, you must secure the required building permits from the city or town in which your site is located. This allows the local government to ensure your project and the resulting structure will be safe and meet all zoning, size and other requirements. The process involves submitting an extensive application along with a certified site plan, property deed and scheduling of all necessary inspections. Specific requirements vary among municipalities, as does the time it takes to get your building permits. An experienced builder can help you meet all these regulations and secure approval.

    Are you okay with a 6 month lead time?

    Metal buildings generally take less time to construct than wood or concrete buildings, but the exact timeline varies widely. We recommend allowing at least 6 months for the process, which includes matching you with a local builder, developing a scope of work and design proposal, fabricating the building components and delivering your structure to the site. The actual time from start to finish is determined by a variety of factors, including the size of the building, the complexity of the design, availability of materials and uncontrollable variables such as the weather.

    Have you contracted a builder?

    Some business owners with construction experience choose to build or to coordinate the building of their own structures independently, often with prefabricated metal building kits. This do-it-yourself approach can work for smaller structures, but for medium- to large-sized buildings, it’s best to enlist the services of a high-quality builder. An experienced builder, paired with the right metal building manufacturer, can help guide you through the entire process, from ensuring that your site and structure conform to all local building codes to construction to final approval for occupancy.